The Scheme will provide a 1.5km long, 2-way, dual carriageway along the A4119 Coedely between the South Wales Fire Service HQ Roundabout and Coedely Roundabout. This will replace the existing 2-way single carriageway between the South Wales Fire Service HQ Roundabout and Coedely Roundabout. A 3 metre wide shared community route will follow the A4119 Coedely along the west of the carriageway connecting the Llantrisant Business Park roundabout to the existing cyclepath which comes out at the Coedely Roundabout.
A4119-coedely
A4119-roundabout

An active travel bridge is to be installed south of the Coedely Roundabout to allow pedestrians and cyclists to cross from the new shared community route into Coedely. The foot-bridge and shared use path will support the walking and cycling to work for local employees of the new development in Coedely and reduce car dependency. There are no public rights of way affected by the Scheme.

The carriageway on the existing road-bridge north of the Coedely Roundabout will be widened to allow a 2-lane merge off the roundabout to the Design Manual for Roads and Bridges standards.

Next Stage – Compulsory Purchase

The Council shall submit to the Welsh Government the Rhondda Cynon Taf County Borough Council (A4119 Dualling) Compulsory Purchase Order 2020 for confirmation.  Full details of the scheme and the Compulsory Purchase Order are below. 

Rhondda Cynon Taf County Borough Council (A4119 Coedely Dualling) Compulsory Purchase Order 2020

Press/Site Notice

Compulsory Purchase Order Statement of Reasons

Maps referred to in the Rhondda Cynon Taf County Borough Council (A4119 Coedely Dualling) Complusory Purchase Order 2020 (1 of 2)

Maps referred to in the Rhondda Cynon Taf County Borough Council (A4119 Coedely Dualling) Compulsory Purchase Order 2020 (2 of 2) 

Rhondda Cynon Taf County Borough Council(Stopping Up of Private Means of Access to Premise at A4119 Coedely Dualling) Order 2020

Stopping Up of Private Means of Access to Premises Statement of Reasons

Maps referred to in the Rhondda Cynon Taf County Borough Council (Stopping Up Private Means of Access to Premises at A4119 Coedely Dualling) Order 2020

Documents referenced instatement of reason (English Only)

Transport

1 - A4119 Ely Valley Road Dualling, Coedely - Transport assessment  - June 19

2 - A4119 Ely Valley Road Dualling, Coedely, Transport Assessment Addendum - Nov 19

3 - A4119 corridor assessment, traffic forecast and capacity assessment - May 18

4 - Covid-19 technical note from Redstart – July 20

WelTAG

5 - Coedely: Strategic Outline Case Report (Weltag stage 1) - Jan 18

6 - Coedely: Strategic Outline Case Report (Weltag stage 1) – Impact Assessment Report - Jan 18

7 - Coedely: Outline Business Case Report (Weltag Stage 2) – Impact Assessment Report - Oct 18

8 - Coedely: Outline Business Case Report (Weltag Stage 2) – Oct 18

Council Decisions and documents

9 - Cabinet Report - 18/07/19

10 - Decision report - 18/07/19

11 - Cabinet report - 21/06/18

12 - Decision report - 21/06/18

13 - RCT Adopted Local Development Plan up to 2021 – p39, 110, 113, 142 and 220

Planning and Ecology

14 - Permitted Development letter from RCT planning - 14th September 2018

15 - Letter from RCT planning confirming EIA not required – 20th July 2020

16 - Coedely A4119 Dualling Bat Survey Report - May 20

17 - Coed Ely A4119 Dualling Planning Dormouse Survey - July 19

18 - A4119 Dualling Preliminary Ecology Assessment - Sept 16

19 - Environmental Impact Screening Report – Feb 18

20 - A4119 Ely Valley Road Improvement Scheme, CoedEly - Noise Assessment report - Feb 19

Public and land owner consultation

21 - Public consultation boards - Feb 19

22 - Project introduction letter – Aug 17

23 - Design update letter  01/07/20

Proposed Scheme Design

24 - Preliminary design general arrangement overview – P048-SH-80-01-P01 – May 2020

25 - Preliminary design general arrangement detail – P048-SH-80-(02-04)-P01 – May 2020

26 - Preliminary design general arrangement detail – P048-SH-80-(03)-P01 – May 2020

27 - Preliminary design general arrangement detail – P048-SH-80-(04)-P01 – May 2020

Help us improve - don't include personal or financial information, e.g. your National Insurance number or credit card details.