Skip to main content

Rhondda Fach Active Travel Route Phase 3

The Rhondda Fach Active Travel Route (the Route) is a new walking and cycling route between Maerdy and Stanleytown in the Rhondda Fach Valley. The Route will follow the alignment of the former railway line along the valley floor and will include links to local communities, shops, schools and leisure facilities.

The Route has been split into five phases. Phase 1 was completed in December 2023 and Phase 2 will be completed during Spring 2024. Phase 3 and 4, depending on funding availability, will be completed during Spring 2025 and Phase 5 during Spring 2026, again, depending on funding availability. 

Phase 3 of the Route will provide a walking and cycling link between the Route and the community of Maerdy and will start adjacent to Station Road and link to Blake Street and the rear lane of Richard Street in Maerdy.

The consultation documents and supporting material can be found below.

You can also contact us at:

Post  -  Freepost RSBU-HJUK-LSSS, Research & Consultation, Public Relations & Strategy, The Pavilions, Cambrian Industrial Park, Clydach Vale, Tonypandy, CF40 2XX

Email  -  ActiveTravelConsultation@rctcbc.gov.uk

All correspondence should be received no later than 19th February 2024.

Reports 

P187-S3-DAS-01

Design and Access Statement

 1.6mb

Drawings 

P187-S3-71-01

Phase 3 – Location Plan and Planning Boundary

 1mb

P187-S3-71-02

Phase 3 – General Arrangement (Sheet 1 of 2)

0.6mb

P187-S3-71-03

Phase 3 – General Arrangement (Sheet 2 of 2)

0.8mb

P187-S3-71-04

Phase 3 – Cross Sections (Sheet 1 of 2)

0.5mb

P187-S3-71-05

Phase 3 – Cross Sections (Sheet 2 of 2)

1.5mb

P187-S3-71-06

Phase 3 – Drainage Strategy (Sheet 1 of 2)

0.5mb

P187-S3-71-07

Phase 3 – Drainage Strategy (Sheet 2 of 2)

0.6mb

P187-S3-71-08

Phase 3 Permeable Surfacing Detail Detail Along Sloped Section of the Route

0.5mb

P187-S3-71-09

Phase 3 – Replacement Footbridge

0.4mb

Supplementary Technical Reports 

GC3569-RED-74-ATR-RP-D-0005

Ground Investigation Report (Phases 3, 4 & 5)

8mb

WWE19003 PEA Rev B

Preliminary Ecological Appraisal

3mb

WWE22181

Ecological Impact Assessment

6mb

R Fach 1 V3

Sustrans

4mb

G23011

Ground Investigation Factual Report Rev1* 


* Please note: Due to the file size, this report is available only via email request: ActiveTravelConsultation@rctcbc.gov.uk

377mb



 

DRAFT Planning Application Form - Phase 3

0.3mb