The Treorchy to Treherbert Active Travel Route (Phases 2 and 3) proposes the development of new walking and cycling infrastructure linking Penyrenglen School with River Terrace, and continuing along River Terrace within the Rhondda Fawr Valley to provide improved connectivity between Treherbert and Treorchy.

The proposed route will run broadly parallel to the existing railway line and will create a strategic active travel link connecting local communities with key destinations, including, Penyrenglen Primary School, local services, and the wider community network.

The scheme aims to deliver a coherent, direct, safe, comfortable, and attractive off-road route for pedestrians and cyclists, while integrating with both existing and proposed Active Travel infrastructure across the area.

The wider Treorchy to Treherbert Active Travel Route has been divided into three phases:

  • Phase 1   (Treherbert railway station to Penyrenglen Primary School) has been completed to detailed design stage and is currently awaiting Welsh Government funding for construction.
  • Phases 2 and 3 are currently at preliminary design stage and are being progressed with Welsh Government funding. These phases will extend the active travel connection between Treherbert and Treorchy, further enhancing sustainable transport opportunities within the Rhondda Fawr Valley.
The consultation closes on the 21st July 2026.

We will be holding a Drop In sessions where you can ask Officers questions and fill in the survey held at the Old Library, Treherbert, 7th of July, 1pm to 7pm.

The consultation documents and supporting material can be found below.

 Phase 2 Drawings

0311-WSP-66-XX-DR-C-1005_P04

Penyrenglyn School Junction to River Terrace (Sheet 1 of 5)

0311-WSP-66-XX-DR-C-1006_P04

Penyrenglyn School Junction to River Terrace (Sheet 2 of 5)

0311-WSP-66-XX-DR-C-1007_P04

Penyrenglyn School Junction to River Terrace (Sheet 3 of 5)

0311-WSP-66-XX-DR-C-1008_P04

Penyrenglyn School Junction to River Terrace (Sheet 4 of 5)

0311-WSP-66-XX-DR-C-1009_P04

Penyrenglyn School Junction to River Terrace (Sheet 5 of 5)

 

Phase 3 - River Terrace Drawings

0311-WSP-66-XX-DR-C-1001_P06

Off Road Shared Footway / Cycleway

0311-WSP-66-XX-DR-C-1002_P04

On Road Cycle Route

0311-WSP-66-XX-DR-C-1003_P05

Shared Use Route with One-way Street (Sheet 1 of 2)

0311-WSP-66-XX-DR-C-1004_P05

Shared Use Route with One-way Street (Sheet 2 of 2)